FireSentinelSpring 2025

Equipping firefighters with autonomous robot dogs that go where humans can’t.

Three tablets on a peach field showing the FireSentinel system: a full-screen hazard map of Beachwood Canyon, the Telemetry Dashboard listing four canyon regions beside their map, and the DAWG Console with live operation, suppression and environmental readings for a single unit.

FireSentinel is a deployable, autonomous robotics system designed to support wildfire response through live telemetry, suppression capabilities, and safer situational access.

We built it for ACAD 181: Disruptive Innovation, a course at USC’s Iovine and Young Academy, where I worked with three others. Though our work was grounded in business strategy and venture thinking, I led key efforts on operational system design, translating abstract risk into tangible, field-ready interfaces and user flows.

Role

Product Designer

Timeline

Spring 2025

12 weeks

Team

4 Product Strategists

Tools & Skills

Figma

Notion

GTM Strategy

Problem Space

Erratic weather and limited manpower put people at unacceptable risk.

As the effects of climate change increasingly become tangible, our capacity to fight against them remains limited. In early 2025, a series of fires in the Los Angeles area killed over 30 people and caused nearly $50B in property losses.

First responders often enter unfamiliar terrain with limited knowledge, including a lack of visibility and aerial support. This was one of the main deadly factors of the wildfires that ravaged LA. These unpredictable weather behaviors also caused the fires to spread unpredictably, sending burning embers across the county and sparking new fires.

FIG 01. Pacific Palisades after the January 2025 fires — a street grid still legible under the burn scar.

While preventative measures were limited by the weather’s volatility, a deeper systemic issue is also at hand — the decreasing bandwidth of firefighting power. The Los Angeles Fire Department operates with less than 1 firefighter per 1,000 residents, a ratio lower than most major U.S. cities.

The world, including California, is increasingly prone to wildfires due to climate change, with arid conditions increasing LA’s wildfire likelihood by 35%. In fact, in LA, each firefighter is responsible for protecting over 1,140 residents — nearly 30% more than their counterpart cities such as San Francisco. With worsening climate conditions and stretched-thin firefighters, both civilians and first responders are put at unacceptable risk.

HMW empower first responders with autonomous tools that extend their reach, enhance safety, and provide real-time data in the most dangerous zones?

Solution

FireSentinel is an autonomous, deployable robotics system designed to augment wildfire response, with enhanced visibility, suppression support, and safer access to dangerous fire zones. Our first robot model is called DAWG, or Deployable Autonomous Wildfire Guardian.

FIG 02. DAWG carries the sensing and suppression hardware; everything below is the operating system built to command it.

Three surfaces carry the system on a tablet in the field: a regional overview, a hazard map, and a console for a single unit.

All metrics can be exported and integrated into pre-existing Incident Command Systems in standardized NFIRS (National Fire Incident Reporting System) or CAD (Computer-Aided Dispatch) data formats.

Problem Validation

We conducted a user interview with Santa Cruz firefighter Brian Sheckler, as well as studied the likelihood FireSentinel would receive Seed/Series A funding. We understood pain points and studied the growing market of global fire safety equipment to position the need for FireSentinel.

There has been a surge in AI and robotics investing. AI deals comprised over 60% of total VC investments in Q4 2024, and resources such as FEMA’s Assistance to Firefighters Grant Program signal government support.

There is a labor shortage in emergency services. LAFD’s 3,500 firefighters are responsible for nearly 4 million residents, a ratio that challenges the department’s ability to respond effectively to emergencies, according to CNN. By contrast, San Francisco employs more than 1,800 firefighters for a population of 1.5 million.

There is a growing market sector on emergency response and disaster management. Over 930 startups and 26,200 companies operate in the field. Fire stations are generally welcoming to new technology, so long as it passes rigorous on-site testing.

Highlighting these needs, my team and I based our product on three core features: cross-functional tracking and communication among other fire departments for task optimization; a high-level visualization of active sites, for resource prioritization and reallocation; and an interface that integrates with existing diagnostic workflows through APIs.

Design Process

I took lead on an interface that prioritizes our key features. For a page that needed to condense a lot of information, I wireframed the DAWG Console page to emphasize the most important information.

Condensing all the live operation and system diagnostics was challenging, especially when accommodating future iterations with potentially more metrics. I tinkered the most with hierarchy and information grouping.

For the Telemetry Dashboard, I also iterated the most on hierarchy and information grouping. This was also the first time I designed my own icons to easily represent the most critical information at-a-glance for firefighters.

And with the creative freedom I had in designing, I had the chance to focus on the details — playing with icon states and interactive elements for clear status communication for the Map feature.

Design System

To create consistent and scalable branding, I combined all elements into a balanced design system. This also allows FireSentinel to accelerate its development process, focusing its R&D more on the hardware.

FIG 07. Logo, typography, icons and color in one sheet — including the unit icons drawn for the dashboard.

Business Strategy

To make our dreams reality, we had to ground our goals.

Within already existing companies that specialize or include firefighting robotics systems, FireSentinel reigns on top — especially within its hybrid capabilities and residential targets.

To synthesize the business skills we had learned in class, we also emphasized the feasibility of our product given Series A funding. With certain KPIs, such as legal certification and DAWG R&D on-field iteration, we fully laid out the implementation of FireSentinel for a fiscal year.

From these analyses, FireSentinel is built on three main ideas:

Takeaways

Design is a holistic process.

Being involved in the business- and capital-aspect of our product allowed me to be a more informed and intentional designer. With this class taking on a more product management angle, I was forced to lean outside of my newfound niche of UI/UX. Being receptive to all aspects of a product is important to designing a more intuitive product that fits your user better.

Visual storytelling is critical in new ventures.

Out of all crit sessions, we mainly iterated the most on our user scenario of our pitch deck. My team and I held countless calls and meetings to extract the key message of our product, in a way that made the most sense to our target audience, from more pathos to logos.

User interviews are the clearest way to define pain points.

If more time allowed for the scope of this product’s development, we would have greatly benefited from interviewing more firefighters, especially across the LA county. While this product is designed to be scaled, the bandwidth gap among LA firefighters is among the most critical. Understanding specific pain points more closely would allow our product to integrate more seamlessly with already existing workflows.

And a special shoutout to my team members Cooper, Costa and Siena — and Chris Swain for his professional mentorship throughout this process!